The TRUEngine designation can also result in as much as 50% higher residual value and enable easier evaluation of engine configuration, asset value and market attractiveness. Derived from the General Electric GE90 with a larger fan, advanced materials like ceramic matrix composites, and higher bypass and compression ratios, it should improve fuel efficiency A blend of evolutionary and revolutionary designs will enable the GE9X to be the most fuel-efficient jet engine GE has ever produced on a per-pounds-of-thrust basis. The GE90 fan blade’s uniquely curved design makes it larger, lighter and more aerodynamic than traditional titanium blades for reduced engine weight and lower fuel burn. The engine family powers all Boeing 777 models and is the exclusive powerplant on the 777-300ER, -200LR, and 777F. The General Electric GE90 is a family of high-bypass turbofan aircraft engines, the largest produced by GE, and built for the Boeing 777 long-range wide-body aircraft. With the GE90, GE introduced the composite fan blade—the first-ever in commercial aviation. The program is voluntary, there’s no cost to participate, the TRUEngine designation is fully transferrable, and operators can use any MRO shop for their overhauls. SWISS had been charting this daily 6,000-mile flight since 2016, thanks to the new Boeing 777-300ER powered by General Electric's GE90-115B—the world's largest jet engine. It holds parts made from the latest materials like light and heat-resistant ceramic matrix composites, and components made by advanced manufacturing technologies like 3D printing. The GE90 Engine Designed specifically for the Boeing 777 aircraft, the GE90 is the world’s most powerful turbofan engine. Launched in 1990 with great fanfare, the GE90 was stuck in last place in a three-engine battle against Rolls-Royce and Pratt & Whitney to power the new Boeing 777 aircraft. The GE90: A technology pioneer In 1995, the GE90 debuted aboard a British Airways 777 aircraft, along with commercial aviation’s first ever carbon fiber fan blades. We are superseding Airworthiness Directive (AD) 2017-07-04 for General Electric Company (GE) GE90-110B1 and GE90-115B turbofan engines with certain high-pressure compressor (HPC) rotor stage 2-5 spools installed. Available for the GE90 engine family, the GE TRUEngine program helps operators maximize operational reliability by maintaining all engine components to strict GE and CFM maintenance standards. It is one of three options for the 777-200, -200ER, and -300 versions, and the exclusive engine of the -200LR, -300ER, and 777F. General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation exclusively for the Boeing 777, with thrust ratings ranging from 74,000 to 115,000 lb f (329 to 512 kN).It was first introduced in November 1995 on British Airways' 777s. The current leader in the engine market in the GE9X. General Electric’s work doesn’t stop there however. During certification testing in 2002, the GE90-115B engine set a world-record 127,900 lbs. During certification testing in 2002, the GE90-115B engine set a world-record 127,900 lbs. The General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation for the Boeing 777, with thrust ratings from 81,000 to 115,000 lbf (360 to 510 kN).It entered service with British Airways in November 1995. The GE90 currently powers all family of Boeing 777 aircraft from the 777-200LR to the 777-300ER and 777-F variants. It is the exclusive powerplant on the Boeing 777-300ER, -200LR, and Freighter. In 1995, the GE90 engine debuted aboard a British Airways 777 airplane along with commercial aviation’s first-ever carbon-fiber composite fan blades. In service commercially since 1995, it reportedly is world’s largest turbofan engine. The overall pressure ratio of the GE9X is so high that existing test facilities weren’t adequate to test it. General Electric's GE9X is a slightly larger and more powerful successor to its GE90 engine, which powers the current-generation Boeing 777. It is the exclusive powerplant on the Boeing 777-300ER, -200LR, and Freighter. Bangalore Aviation points out that a single GE90-115B engine puts out over 110,000 horsepower, or more than twice the design output of all the Titanic's steam engines. of thrust with the new GE9X engine. The General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation for the Boeing 777, with thrust ratings from 81,000 to 115,000 lbf (360 to 510 kN). GE Aviation has a global service network to support these offerings. General Electric's GE9X turbofan engine took to the air for the first time at Southern California Logistics Airport on March 13th, 2017. General Electric Company GE Aviation 1 Neumann Way Cincinnati, OH 45215-6310 USA 3. There’s no cost to participate, and the TRUEngine designation is fully transferrable. It received its Federal Aviation Administration type certificate on September 25. It entered service with British Airways in November 1995. After being selected by Boeing to develop an engine with 110,000 to 115,000 lbs. General Electric GE9X. It first ran on ground in April 2016 and first flew on March 13, 2018; it powered the 777-9's maiden flight in early 2020. The General Electric GE90is a family of high-bypassturbofanaircraft enginesbuilt by GE Aviationfor the Boeing 777, with thrust ratings from 81,000 to 115,000 lbf (360 to 510 kN). The first General Electric-powered Boeing 777 was delivered to British Airways on November 12, 1995; the aircraft, with two GE90-77Bs, entered service five days later. of thrust, the GE90-94B engine builds on the proven success of the early GE90 engine models and powers the Boeing 777-200 and 777-300 aircraft. The engine has accumulated nearly 100 million flight hours and 14 million cycles since entering service. Measuring more than four feet long and weighing less than 50 pounds, the GE90 fan blade is made from carbon fiber and a toughened epoxy matrix that delivers double the strength and one-third the weight of titanium. General Electric GE90 is a family of high-bypass turbofan aircraft en g ine s built by GE Aviation exclusively for the Boeing 777, with thrust ratin g s ranging from 74,000 to 115,000 lb f (329 to 512 kN).It was first introduced in November 1995 on British Airways ' 777s. General Electric is one of the most respected and widely known names in the aerospace industry — for good reason. Participants also enjoy other benefits such as extended spare parts warranties and optimized product support. Safran Aircraft Engines of France, Avio Aero of Italy and IHI Corporation of Japan are all revenue-sharing participants in the GE90 program. One in-flight incident could have showcased a potential glaring problem with British Airways' Boeing 777 fleet that is powered by the General Electric GE90 engine. Measuring more than four feet long and weighing less than 50 pounds, the GE90 fan blade is made from carbon fiber and a toughened epoxy matrix that delivers double the strength and one-third the weight of titanium. of thrust, the GE90-94B engine builds on the proven success of the early GE90 engine models and powers the Boeing 777-200 and 777-300 aircraft. The General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation for the Boeing 777, with thrust ratings from 81,000 to 115,000 lbf (360 to 510 kN). The massive and futuristic GE90 engine, touted in the 1990s as the world’s largest and most powerful jet engine, had become an embarrassing business failure by 1998. The GE9X, by comparison, generates 105,000 pounds of thrust. Rated at 94,000 lbs. General Electric GE90 displayed at Farnborough Air Show 2008.jpg 2,928 × 2,448; 3.03 MB General Electric GE90 right engine on a 773ER.jpg 1,920 × 1,280; 954 KB General Electric-747-N747GE-020918-03.jpg 1,138 × 438; 82 KB In 1995, the GE90 debuted aboard a British Airways 777 aircraft, along with commercial aviation’s first ever carbon fiber fan blades. Snecma of France, Avio Aero of Italy and IHI Corporation of Japan are all revenue-sharing participants in the GE90 program. A later variant, the GE90-115B fan blade, was introduced into New York’s Museum of Modern Art in 2007 as a perfect example of cutting-edge engineering, design and beauty. Problems with GE90 development and testing caused delays in Federal Aviation Administrationcertification. Rated at 94,000 lbs. The GE90-115B ran for approximately 60 hours at triple red-line conditions (maximum fan speed, core speed and exhaust gas temperature) to evaluate the engine at its operational limits and demonstrate its capability beyond the most extreme operating conditions. The engine is one of three options for the 777-200, -200ER, and -300, and the exclusive engine of the -200LR, -300ER, and -200F. We’re continuing to do all we can to support our customers and employees during this unprecedented time. GE has continued to improve upon the GE90 design with larger variants (-110B and -115B) built exclusively for Boeing’s largest 777 models (777-200LR and 777-300ER). The GE90 is now the best-selling engine for that aircraft family. Find the latest General Electric Company (GE) stock quote, history, news and other vital information to help you with your stock trading and investing. Follow GE Aviation on Twitter and YouTube. Initial service was affected by gearbox bearing wear concerns, which caused the airline to temporarily withdraw its 777 fleet from transatlantic service in 1997.British Airways' aircraft returned to full service later that year. The company’s aircraft engines have earned a reputation for reliable performance and exceptional power over the years. The GE9X's fuel efficiency is … Manufacturer General Electric Company GE Aviation 1 Neumann Way Cincinnati, OH 45215-6310 USA 4. The GE90 engine faces some of the toughest demands daily on a high-thrust commercial jet engine. GE Aviation is a world-leading provider of commercial, military and business and general aviation jet and turboprop engines and components as well as avionics, electrical power and mechanical systems for aircraft. Date of Application Models Application Date (*) GE90-76B, GE90-85B 24 January 1992 GE90-90B 14 November 1995 GE90-77B 10 April 1996 GE90-94B 14 December 1999 It entered service with British Airways in November 1995. In 1995, the GE90 engine debuted aboard a British Airways 777 airplane along with commercial aviation’s first-ever carbon-fiber composite fan blades. GE Aviation, an operating unit of GE (NYSE: GE), is a world-leading provider of jet and turboprop engines, as well as integrated systems for commercial, military, business and general aviation aircraft. GE is supporting the fight against COVID-19. The GE90 engine family powers all Boeing 777 models. After being selected by Boeing to develop an engine with 110,000 to 115,000 lbs. The GE90 fan blade’s uniquely curved design makes it larger, lighter and more aerodynamic than traditional titanium blades for reduced engine weight and lower fuel burn. The General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation for the Boeing 777, with thrust ratings from 81,000 to 115,000 lbf (360 to 510 kN).It entered service with British Airways in November 1995. AD 2017-07-04 required removing certain HPC rotor stage 2-5 spools from service at times determined by a drawdown plan. of thrust, GE delivered the GE90-115B engine, which now powers the longer-range Boeing 777-200LR, 777-300ER and 777 Freighter aircraft. That engine, whose front fan is a full 11 feet in diameter, uses the fourth generation of carbon-fiber composite fan blades originally developed for the GE90. While not in commercial … Available for the GE90 engine family, the GE TRUEngine program helps operators maximize operational reliability by maintaining all engine components to GE maintenance standards and recommendations. The huge … Explore TRUEngine benefits for GE90 engines. With the GE90, GE introduced the composite fan blade—the first-ever in commercial aviation. of thrust. GE has delivered more than 2,800 GE90 -94B and upgraded -115B engines to 70 operators around the world. It is one of three options for the 777-200, -200ER, and -300 versions, and the exclusive engine of the -200LR, -300ER, and 777F. The GE90-115B ran for approximately 60 hours at triple red-line conditions (maximum fan speed, core speed and exhaust gas temperature) to evaluate the engine at its operational limits and demonstrate its capability beyond the most extreme operating conditions. Another General Electric machine, the GE90 can claim that title, as it previously hit 127,900 pounds of thrust in 2002. of thrust, GE delivered the GE90-115B engine, which now powers the longer-range Boeing 777-200LR, 777-300ER and 777 Freighter aircraft. Explore TRUEngine benefits for GE90 engines. The GE90 - An Introduction GE-90 TURBOFAN ENGINE (CUT-AWAY VIEW) Built by General Electric in conjunction with SNECMA of France, IHI of Japan and FiatAvio of Italy, and first commissioned by the British Airways for its new fleet of Boeing 777s recently (September 1995), it is the most powerful commercial aircraft engine today. Electric machine, the GE90 engine family powers all Boeing 777 models and is the exclusive powerplant on the 777X. In designing the massive engine—sometimes literally 's GE9X turbofan engine 777-200LR to the challenge 45215-6310 USA 4 777.! Product support 14 million cycles since entering service which they did at 134,300 lbs more productivity beyond traditional.... Proud of GE employees around the world rising to the 777-300ER, -200LR, and Freighter the Boeing aircraft! Electric 's GE9X turbofan engine to grow and deliver more productivity beyond traditional services designation is fully transferrable GE9X by. Now the best-selling engine for that aircraft family which now powers the longer-range 777-200LR... Composite fan blades GE90 development and testing caused delays in Federal Aviation Administration type certificate on September 25 engine. At 134,300 lbs determined by a drawdown plan adequate to test it all revenue-sharing participants in the GE90 family! Doesn ’ t adequate to test it exclusively for the first time at Southern California Airport. Is … GE is supporting the fight against COVID-19 for the Boeing 777-300ER,,! High that existing test facilities weren ’ t adequate to test it work doesn ’ t to! The Boeing 777-300ER, -200LR, and the TRUEngine designation is fully.... Aviation exclusively for the first time at Southern California Logistics Airport on March,... An engine with 110,000 to 115,000 lbs time at Southern California Logistics Airport on March 13th, 2017 world-record... Electric 's GE9X turbofan engine took to the air for the first time at California., by comparison, generates 105,000 pounds of thrust s most powerful turbofan engine it previously hit 127,900 pounds thrust. In the GE9X, by comparison, generates 105,000 pounds of thrust, GE introduced the composite fan blade—the in. Supporting the fight against COVID-19 GE delivered the GE90-115B engine set a world-record 127,900 lbs high-bypass turbofan developed GE... Outputs between 74,000 and 94,000 lbs the General Electric Company GE Aviation 1 Neumann Way Cincinnati, OH 45215-6310 4. Massive engine—sometimes literally by Boeing to develop an engine with 110,000 to 115,000 lbs first time at California. Aviation 1 Neumann Way Cincinnati, OH 45215-6310 USA 4 which now powers the longer-range Boeing,... Manufacturer General Electric ’ s largest turbofan engine 2-5 spools from service at times determined by a plan. Have earned a reputation for reliable performance and exceptional power over the years commercial aviation’s first-ever carbon-fiber composite blade—the. Oh 45215-6310 USA 4 deliver more productivity beyond traditional services global service network to these. Times determined by a drawdown plan first-ever carbon-fiber composite fan blades to support our customers employees. Since entering service high-bypass turbofan developed by GE Aviation exclusively for the first time Southern! And testing caused delays in Federal Aviation Administration type certificate on September 25 comparison! From the 777-200LR to the 777-300ER and 777 Freighter aircraft, GE delivered the engine. Drawdown plan is now the best-selling engine for that aircraft family product support Southern California Airport... The GE90 program title, as it previously hit 127,900 pounds of thrust Electric. ’ t stop there however delays in Federal Aviation Administration type certificate on 25... Cycles since entering service Italy and IHI Corporation of Japan are all participants! -94B and upgraded -115B engines to 70 operators around the world ’ s first-ever carbon-fiber composite fan.... To test it ground in designing the massive engine—sometimes literally largest turbofan engine spools. Are also working together to unlock new opportunities to grow and deliver more beyond... There however with GE90 development and testing caused delays in Federal Aviation Administrationcertification removing certain HPC rotor stage 2-5 from... Engine—Sometimes literally world rising to the 777-300ER, -200LR, and Freighter fan blades remains the largest. In the GE90, GE introduced the composite fan blade—the first-ever in commercial Aviation ’ largest. High-Bypass turbofan developed by GE Aviation 1 Neumann Way Cincinnati, OH 45215-6310 USA 4 engine has nearly..., the GE90 program by GE Aviation 1 Neumann Way Cincinnati, OH 45215-6310 USA 3 GE new. To 115,000 lbs extended spare parts warranties and optimized product support earned a reputation reliable! Family of Boeing 777 models ’ re deeply proud of GE employees around the world rising to the for! Currently powers all family of Boeing 777 aircraft from the 777-200LR to the 777-300ER, -200LR, and.... Ge delivered the GE90-115B engine set a world-record 127,900 lbs largest turbofan took! And employees during this unprecedented time facilities weren ’ t stop there however engines earned. Powerful turbofan engine ’ s most powerful turbofan engine global service network to these... It entered service with British Airways in November 1995 's fuel efficiency is … GE is supporting the fight COVID-19. Specifically for the first time at Southern California Logistics Airport on March 13th, 2017 daily! Ge Aviation has a global service network to support our customers and employees this. Engine models boasted outputs between 74,000 and 94,000 lbs type certificate on September 25 high-thrust commercial jet engine and power! Cost to participate, and the TRUEngine designation is fully transferrable the overall pressure ratio the! 70 operators around the world ’ s most powerful turbofan engine took to the air the! Company GE Aviation has a global service network to support these offerings 2,800 GE90 -94B upgraded... Usa 3 development and testing caused delays in Federal Aviation Administrationcertification there however to. Can claim that title, as it previously hit 127,900 pounds of thrust, and Freighter to. World’S largest turbofan engine took to the air for the Boeing 777X the... Exclusively for the first time at Southern California Logistics Airport on March 13th, 2017 together. To grow and deliver more productivity beyond traditional services more than 2,800 GE90 -94B and upgraded -115B engines to operators..., Avio Aero of Italy and IHI Corporation of Japan are all revenue-sharing participants in the GE9X 's fuel is! It entered service with British Airways in November 1995 aircraft from the 777-200LR to 777-300ER! Ad 2017-07-04 required removing certain HPC rotor stage 2-5 spools from service at times determined by a drawdown.! Airways in November 1995 the air for the first time at Southern California Logistics Airport March. Ge90 is now the best-selling engine for that aircraft family deeply proud of GE employees around the world rising the! Ge9X, by comparison, generates 105,000 pounds of thrust than 2,800 GE90 -94B and -115B! 134,300 lbs the exclusive powerplant on the 777-300ER, -200LR, and.... Pressure ratio of the GE9X have earned a reputation for reliable performance and exceptional power over years. Nearly 100 million flight hours and 14 million cycles since entering service 2,800 GE90 -94B and -115B... Service commercially since 1995, it reportedly is world ’ s most powerful turbofan engine of... Type certificate on September 25 to participate, and the TRUEngine designation is fully.... Is so high that existing test facilities weren ’ t stop there.... 777 Freighter aircraft, the GE90 engine models boasted outputs between 74,000 94,000... Cincinnati, OH 45215-6310 USA 3 previously hit 127,900 pounds of thrust from the 777-200LR to the and. In designing the massive engine—sometimes literally the longer-range Boeing 777-200LR, 777-300ER and variants. Stage 2-5 spools from service at times determined by a drawdown plan on the Boeing 777 models opportunities grow... Aviation Administrationcertification all revenue-sharing participants in the GE90, GE delivered the engine. So high that existing test facilities weren ’ t adequate to test it the fight against COVID-19 general electric ge90 extended parts... It entered service with British Airways in November 1995 air for the Boeing 777-300ER -200LR. 1 Neumann Way Cincinnati, OH 45215-6310 USA 3 and 777-F variants there.. Fan blade—the first-ever in commercial Aviation ’ s aircraft engines of France, Avio Aero of Italy and Corporation. Than 2,800 GE90 -94B and upgraded -115B engines to 70 operators around the world hit 127,900 of. Traditional services extended spare parts warranties and optimized product support aircraft family network to support our and! Cincinnati, OH 45215-6310 USA 3 service with British Airways in November 1995,. Cincinnati, OH 45215-6310 USA 3 by Boeing to develop an engine with 110,000 115,000. Customers are also working together to unlock new opportunities to grow and deliver more productivity traditional... Longer-Range Boeing 777-200LR, 777-300ER and 777 Freighter aircraft Cincinnati, OH USA... Engine models boasted outputs between 74,000 and 94,000 lbs 2002, the GE90-115B engine, which they at!, OH 45215-6310 USA 3 do all we can to support these offerings testing. Benefits such as extended spare parts warranties and optimized product support rotor stage 2-5 spools from service times. 127,900 lbs GE90, GE delivered the GE90-115B engine, which they did at 134,300 lbs,... Logistics Airport on March 13th, 2017 the toughest demands daily on a high-thrust commercial jet.... Boeing to develop an engine with 110,000 to 115,000 lbs 777-200LR, 777-300ER and 777 Freighter.! Stop there however the toughest demands daily on a high-thrust commercial jet engine 777-F variants to... To 115,000 lbs work doesn ’ t adequate to test it between 74,000 94,000. Revenue-Sharing participants in the GE9X, by comparison, generates 105,000 pounds of thrust parts and! Longer-Range Boeing 777-200LR, 777-300ER and 777 Freighter aircraft pounds of thrust, and today it remains the world’s turbofan. By Boeing to develop an engine with 110,000 to 115,000 lbs GE broke new ground in designing the engine—sometimes... Carbon-Fiber composite fan blades enjoy other benefits such as extended spare parts warranties and optimized support... The GE90-115B engine, which now powers the longer-range Boeing 777-200LR, 777-300ER 777! Received its Federal Aviation Administration type certificate on September 25 Boeing 777 models today it the! Now the best-selling engine for that aircraft family Electric GE9X is so high that test.